Showing posts with label socks. Show all posts
Showing posts with label socks. Show all posts

Sunday, June 22, 2008

L is for . . .

Lace. Lots and lots of lace.

The Summer of Lace officially kicked off yesterday, on the first day of summer. As of Friday, I was 14 repeats done with Madli's Shawl. The pattern calls for 31 repeats, but I may make it a few repeats long. Even with 14 repeats, I've still go 9 grams (about 68.5 yards) of the first skein left. I haven't been tracking how much yarn each repeat takes, but I'm hoping that I can get another 3.5 repeats out of this skein. That way, I can use 2 skeins, rather than all 3, and get 35 repeats in. Right now, the unblocked shawl measures about 24" x 15"; the pattern says the final blocked measurements should be 62" x 19". I think that if I add another 4 repeats, I should get about those measurements--maybe a little longer--without too much heavy stretching.

And it would leave me one more skein of the baby camel yarn--381 yards--to play with.


Yesterday, however, I cast on for a brand-new lace project:


I was aiming for a repeat of the Waving Lace socks from IK's Favorite Socks book, but had a complete failure to read the actual chart. In the chart, the yo's stay on the sides of the pattern repeat, but for some reason I moved them over with the paired decreases. I think the effect of this is that the knitting doesn't pull from side to side in a bias, making them way less wavy than the first attempt. But I still like the way they're coming out, so I'm going to stick with it and knit up some not-so-waving lace socks.

Thursday, June 19, 2008

Two Steps Forward (One Step Back)

Two steps forward: Basic socks with a 3x1 ribbing, in Lorna's Laces Shepard Sock (Georgetown colorway, which has more aqua/green than this photo shows). Size 1.5 needles, magic loop. For my bff L--I'll pop them in the mail to her soon.


One step back: In November, I started a pair of Waving Lace socks, from IK's Favorite Socks book. I finished the leg on one sock, put them down, and didn't pick them back up again until yesterday, at which point I couldn't quite figure out where I'd left off (for some reason, I'd stopped in the middle of a repeat, rather than at the end of one). I also couldn't get quite the same gauge.

So I've ripped them out and will restart them again, maybe on Saturday for the Summer of Lace. I like the way this pattern looks with this yarn (Sundara Sock yarn, Electric Pear colorway), though, so no change there. Just a fresh start.

Sunday, March 2, 2008

Finish-itis

Blue knee socks for a three-year-old, done and mailed:


Swallowtail, done:
(details on Ravelry)

Flowerbasket shawl, started, blocked, and done:
(details on Ravelry)

Both shawls were knit using Fearless Fiber sock yarn (Brick House, the red yarn, was a gift from my sockapalooza pal; Hudson, the blue yarn, was purchased through the Ravelry ISO/Destash board)--the colors are amazing. Perfect for lace--enough color variegation to be interesting, but not so much that it's overwhelming.

Saturday, February 9, 2008

Startitus

Ramona: Re-started to fix the scallopping at the bottom of the center seam. Since I managed to snip the wrong thread, I ripped back a few rows and added another inch to the length. The knitting's been done for at least a week, but I can't seem to manage to sew the hem down and reseam. Which is too bad, since I'd really like to wear it again before the weather's too warm for angora. Blue socks-that-come-up-to-his-knees for T. One is almost done, and I've cast on for the second, but I haven't had a lot of car knitting time lately.



Cabled baby blanket for the new, not-quite-here-yet nephew. The only problem is I'm not in a cabling kind of mood. But SIL really wanted a cabled blanket, so I'm pushing through a couple of rows a day.



And once I manage that, I turn to my new love:

Swallowtail Shawl, from Interweave Knits Fall 2006 by the oh-so-amazing Evelyn Clark. The yarn is Fearless Fibers superwash sock merino, in Brick House, and the colors are wonderful. Very subtle and interesting. I think it will look wonderful when it's blocked. The yarn was a gift from my sock pal, and I've been saving it to find something that would show off the colors.










I started it on Tuesday, 2/5; I'm done with the first border chart already. So another three days or so and I should be ready to block it. The nupps aren't too bad; I'm using size 6 KnitPicks Harmony needles, and I've been nupp-ing loosely, so the p5tog are going relatively well. (What does "nupp" stand for, anyway? Why nupp? Why not nipp? or nup?)
I started it in part because, having just mailed off my dissertation in its penultimate form, I needed something a little complicated to distract me. I'm thinking about giving it to my (female) head advisor after my defense; I'm not sure if that means I need to knit something for each of my committee members, though. I've got another skein of Fearless Fibers sock yarn, although it's not the superwash version, so the skein has less yardage. Maybe another Swallowtail? Or something slightly less complicated (or at least, less-complicated looking) for my third reader (also female), and a scarf for my second reader (male)?
I'm hoping to schedule the defense for my spring break, which is the first week in March; it would be easier to go down if I don't have to juggle classes at the same time. We'll see what the committee says, though. But at the rate this shawl is moving, I should be able to finish another couple of gifts before then.

Sunday, January 27, 2008

Seuss-ical Socks

Yarn: Regia Silk Color, 1 skein with only a very few inches left over. Purchased at Webs.
Pattern: My own; 48 stitches in 2x2 rib for the leg with an afterthought heel to keep the stripes striping.
Gauge: 17 stitches = 2 inches
Needle: 1.5 (2.5mm) KnitPicks circular, knit using magic loop.
For: Big Nephew (a designation that strikes me as entertaining, as my "big" nephew, T, is three and weighs somewhere around thirty-three pounds. Compared to his unborn brother, G, due in April, though--he's definitely the big one.)
Verdict: I think he'll like them. He wants blue ones next. I like the silly orangey striping; he asked for orange socks last time; this was the best orange I could find.

Now that the doctors have said that the little nephew is far enough along that even if he comes early, he should be okay, I can cast on for a cabled baby blanket for him. So blue travel socks for T, and a yellow cabled blanket for little G (as per his mother's request) are next up!

Thursday, January 10, 2008

Merry (belated) Christmas

I have finally finished the Christmas knitting, as well as a few other things. And I've started working on a new sweater for me--Ramona from Sensual Knits--which I'm very excited about and deserves its own post. It's been on hold for a couple of days; I've been using it as a carrot to finish up my brother's sweater. Now that I'm done with that, though, Ramona it is!

I've also started a new pair of nephew socks. After the success of the red-socks-that-come-up-to-his knees (one of the bind-offs is a little tight, but he won't let them out of his sight long enough to mail them to me so I can fix it--how cute is that?) The nephew has requested orange socks next. Orange is a surprisingly hard color to find--maybe it would be easier in October? Or in a city where team colors include orange, maybe. But I found some funky Regia silk yarn at Webs, and have made it down to the start of the foot on the first sock. I've knit in some scrap yarn to mark an afterthought heel, which will both keep the funky striping going nicely as well as make sure that the socks are as long as possible. I can always make the heels and toes a different color if I need to. Next time I'm going to try toe-up socks with an afterthought heel--the toe-up heel is what's really been giving me pause.

I knit about 2 inches of the ribbing during my first day of classes yesterday--I needed writing samples from everyone, making a portable project important.

Also done recently: basic socks in Claudia Handpainted, blue terra cotta color:

I was a little "meh" about this pair; the yarn is fine (although weirdly thick-and-thin in a few places, as if it weren't spun/plied/twisted tightly enough), but a little splitty and I had some trouble with dropped stitches. I think that I'm going to send them to my bff, who likes hand knit socks almost as much as the nephew. (I've also got some peppermint marshmallows for her--we've been big hot chocolate buddies since college--yum!)

And, most importantly, I've finished my not-so-little-brother's (who shall be, from now on, the NSLB) Christmas present:


It was too big to get the whole thing in. The details: a seamless hybrid sweater, based on Elizabeth Zimmerman's percentages formula, using Plymouth Encore in a heathery green with contrasting tan hems, knit on KnitPicks Harmony interchangables size 6. I bought what I thought was an extra skein of yarn but wound up unpicking my gage swatch so I could sew down the collar hem. 47" chest. Lessons learned: 1) NSLB sweaters take a lot more yarn than I would imagine, and 2) NSLB sweaters need to be started at least two months before they're due to be gifted. Also, count everything. Frequently. And then have someone else count for you, just to be sure.

I started using a Russian join on this one--the yarn is superwash, and has some acrylic in it, so spit-splicing didn't seem like a good option. I really liked doing this--way fewer ends to weave in at the end, which made finishing pretty easy. And I like this sweater recipe a lot--I don't think this will be the last one I make. I'll have to wait for a report on how it fits, though, for a final decision.

Wednesday, December 5, 2007

He likes them!

He really, really likes them!

No picture, alas. But I finished the nephew socks and mailed them off on Saturday--the arrived in New Jersey yesterday.

My parents picked T up from daycare, and told him there was a package for him at home. To which he replied: "my socks!"

My spies tell me that he tore open the package, put them on, and slid merrily around the kitchen in them. And wore them to sleep in.

He's requested another pair, also in red, but "that come up to my knees." Knee socks for three-year-olds. A three-year-old who climbs into my lap and says "My Duzan" and snuggles. So knee socks it is.

I went out and bought the yarn this morning. Now I need to learn how to knit toe-up socks, so I can make them as long as possible. Maybe I'll start with a silly color for the toes, so they're really, really long.

Sunday, December 2, 2007

December Goals

It's been a busy month--too much time spent grading and not enough knitting or blogging. My last day of classes is this Tuesday; I've had several rounds of papers to grade this month. All of my classes are writing classes and on the last day I ask my students to give me a portfolio with all their work, along with a (new) reflective essay--which is nice, because it means most of the grading is done before the end of the semester, but it also means a lot of grading around Thanksgiving.

Teaching would be so much more fun if it weren't for all the grading. :)

I've also got a cold that won't go away--I lost my voice for a few days (much to the amusement of my nephew over Thanksgiving!) and now just have a persistent cough.

I have been doing some knitting, though--no sweater for November, but the pressure to finish my brother's Christmas present in time for Christmas will just add to the fun.

The goals round up:

November goals:
  1. Finish the Stripes and Torchon scarf--or at least, finish up all the yarn I have and, if I run out, work on finding more. almost there--stay on target! I've got about a repeat of the border left; Somehow (even though I've followed the pattern!) the border has wound up not working out exactly, and--since there are 34 rows--it's a little harder to fudge and make it wind up looking even than I'd have imagined. But I should be done with it today or tomorrow, and then I'll cast on for
  2. Start and finish the Brother sweater. Not even close. So not even close I haven't even finished the maths for it, although I swatched. Two months ago, so maybe I should swatch again?
  3. Knit socks for T, who saw me knitting them and said he'd like a pair. Of course, he's three, so he may not remember, but I do. And he's got little feet, so they shouldn't take too long. Done, mailed, but not photographed. I was working on another pair of socks over Thanksgiving, and he asked me again about his socks; I showed him the yarn I had with me and he decided he liked the leftovers from my red Aracaunia Ranco socks and wanted red socks. He kept bringing me the yarn and asking about them--a totally adorable, if somewhat unrealistic, expectation of how long it would take to knit a pair of socks. The enthusiasm was nice, though! I didn't have enough yarn, even though I made the cuffs fairly short--he got red socks with blue toes.
  4. Start a chevron scarf and see if the colors I have will work. I'm saving this as a treat, since I can't wait to use the yarn. Done, here, but not successfully. I"m rethinking the colors, and what to do with my lovely Posh yarn.
  5. Learn a new technique. I'm not sure what--maybe cabling without a cable needle, since I'd also like to No new techniques, but I'm getting better with the magic loop.
  6. Knit at least one pair of Fetching mitts. One down, one to go--does the thumb gusset count as a new technique?
Stash acquisitions: Blocking wires from Joann.com, which I would link to, but they don't seem to have them in stock right now. But with a 50% off coupon, they wound up being around $20 including shipping. I haven't used them yet--the Stripes and Torchon scarf will be my first project using them. I also bought some Claudia's handpainted in Blue Terra Cotta in a Ravelry Swap, along with the Sundara sock yarn.

Actual November knitting:
  1. Most of the Stripes and Torchon scarf
  2. Socks for the nephew
  3. Red socks for me
  4. Cast on for Waving lace socks from IK's Favorite Socks; they're too big, though, and I need to start over with a smaller needle size
  5. Cast on for a pair of basic socks with the Claudia's handpainted
December Goals:
  1. Finish Stripes and Torchon
  2. Start and finish the Brother sweater--third time's a charm? And, damn it, if I don't, I have to come up with another present idea.
  3. Finish the second Fetching mitt--they're a present for my aunt for Christmas
I'm limiting myself to those three. I'm sure that at least the basic socks will get a fair amount of knitting, as well--the more I knit, the more I like to have a mindless portable project that travels well.

Since the semester is almost over, and the bulk of my grading is already done, I think I can manage those three. If I get them done early, I may aim for a hat or two, and rethink the scarf for myself, as my new winter coat is a basic black wool coat that comes down to my knees, so a new colorful scarf to go with it would be great

Wednesday, November 7, 2007

At least I made the bed

Although I should have cleaned the mirror, too:Ravelery beta t-shirt, "Where my stitches at?"*
A very sad attempt to photograph my Perfect Sweater, since it's actually cold enough to want to wear wool.



























Sundara Sock yarn, Electric Pear, purchased via the Ravelry ISO board




Knitting: basic sock in Araucania Ranco Multi.

*this is a women's size XL American Apparel shirt. The shirts are supposed to have negative ease, but I don't really like negative ease in a t-shirt, so I ordered the XL (37.5" bust, I think?) for myself and my 36" bust. And although there's been much discussion of a the "lack" of proper grammar in the "where my stitches at?" catch-phrase, as a writing teacher and a self-proclaimed grammar fan, I rather like it. I think it does a great job of conveying tone and attitude, which is more important than rigid adherence to silly and somewhat-archaic grammar rules. I think I've got to go with Winston Churchill on dangling participles.

Monday, October 29, 2007

Skein to Socks


Basic socks; 64 stitches on size 2.5mm needles, magic looped. Slipped-stitch heel flap.
Collinette Jitterbug sock yarn in Monet.

These took 10 days from skein to sock--I love magic loop!

They're a little long on me, and I was too lazy to rip them back and make them shorter, so I'm sending them to my darling L.

Thursday, October 25, 2007

Fits and Starts

Fits and starts. That seems to sum up my whole life, lately, including blogging.

Work-wise, I'm in grading jail. I should be grading right now--I'm already behind on where I want to be--but can't motivate myself to read papers.

Students are fighting me on their new paper topics--it needs to be directed at a specific, focused audience with whom the students have credibility; they keep wanting to write to Port Authority or iTunes instead of student groups or companies they've worked for. I don't understand their resistance to listen to my suggestions, since my pushing them to focus is in their best interest. You'd think that upperclassmen, at least, would have learned that if the person grading the paper suggests they tweak their topic a bit, they'd listen. But instead, they're fighting me on it. I'm tempted to give in, let them write what they want, and then suffer the consequences when grades roll around.

On the bright side, I'm teaching a course I really want to teach this summer; I'm having a ball requesting exam copies of texts so I can decide which ones to use. I want to spend all my time on that syllabus, which I won't need until July, instead of grading the papers I need to turn back tomorrow.

School-wise, I sent my committee what is (I hope) my penultimate draft, but it's taken almost 7 weeks of me emailing, asking if we could set up a time to get anything like a concrete response. My adviser said they needed about a month to read through, since they have other commitments. So now I've emailed back with a "how about this date" suggestion; I suspect it will take a month of emails asking them to confirm before my adviser gets back to me about it. Which means we'll need another date, and that puts us up to Christmas and winter break, so I'm afraid we're looking at January to talk about a draft I sent in August. I hate it that I continually have to bug for responses--it makes for a weird power dynamic.

Home-wise, G is crazy, crazy busy--he's teaching an overload, and taking a Polish class, and trying to carve out some time to work on his own stuff. His days are longer than mine--he's in class until 8:00 tonight. I might spend all day grading and prepping, but at least I'm home today, and can distract myself with other stuff. He's so busy he missed an important lunch the other day, with a visiting scholar. I've set up google calendars for both of us; maybe daily email reminders will help. I feel like I never see him anymore, and he's so stressed that I don't want to add to it.

The apartment is a mess; most of it is G's stuff (fishing lures and reels and articles for papers, classes he's teaching, the dissertation) and he's not home enough to get organized. Or when he's home, he's frantically trying to finish prepping for a class. I can't organize for him, because then he can't find anything. I'm trying to get him to take a few minutes every day to at least organize his office enough to make it usable; currently it's not and he's slowly taking over mine as well. I'm thinking about leaving yarn everywhere to discourage this practice.

Knitting-wise, I'm done with 22 out of 40 repeats on the Stripes and Torchon Shawl for my SIL. It's going to be huge when it's done; I don't know if I should block it or not. If I do block it, I'll probably spritz it with water and pin it out, rather than soaking it. But I've slowed down on that, in part because I'm afraid I might run short of yarn on the edging. I weighed what I have left, and tried to guesstimate how many grams I'm using per repeat, but I didn't weigh how much I had before I started the border (or even before I joined this current ball of yarn), so I can only guess. And that guess looks to be a couple of grams short. I should just power through the edging, get to the end and know for certain--that way I can decide how to deal with it, and if I need more yarn have a shot at getting it before Christmas.

G's worn his seamless hybrid sweater a couple of times; he really likes it. So much that he wants one in a sort of rust color (we'll see how long it takes to find a color that matches his description--it took a long time for him to find a green he liked). I'm not even going to look for yarn until at least January, though.

I swatched for the Brat's sweater, and even washed the swatch. But that was weeks ago, and I probably should re-swatch before starting anything. I may not cast on this month; maybe I'll call it a plan, since November is National Knit a Sweater Month.

I have been knitting socks, though. I learned how to do a Magic Loop and love it. I learned to knit holding a long straight needle under my right arm, which makes for lovely even tension, but isn't at all useful when learning how to use circular or double-pointed needles. DPN, in particular, have always felt extremely awkward, and I sometimes get laddering where I change needles. With Magic Loop, no ladders. And no DPN to lose, making portable sock knitting more appealing. I finished a plain sock using the Jitterbug I bought at Knit Purl and I'm working on the second sock. (The Snicket sock, though--definitely SSS. It's odd how the thought of knitting another basic stockinette sock sounds just dandy, but following an actual pattern again brings out a strong desire to start something else.)

Stash-wise, I'm going strong. I bought the Namaste Executive bag from Webs; I was going to get it in rust, but they were sold out and it was on back order. So I asked them to send a black one, instead. So far, I really like it, although my tendency to overload my bags could be a problem--the bag is quite large. The inside is black, too, making it a little hard to see, and it doesn't have enough interior pockets for pens, etc, so I bought a couple of bright travel toiletries bags ($0.99 at Target) to keep odds and ends in.

I've also bought another skien of Socks that Rock, lightweight, in Carbon Dating (which seems to be a retired color; I can't find a picture to link to)--it should be here soon--and a skein of Cherry Tree Hill Merino Lace, in Wild Cherry--also should arrive within a few days. I bought both of them off of Ravelry, which is an evil, evil, enabling place that I cannot resist. Someone posted a link to JoAnn's last night--they have Namaste bags and a 50% off any one item coupon. The bags aren't label Namaste, but if you zoom in you can see the logo. I'm tempted to buy a messenger bag, as well. G (who is also an evil, evil enabler) suggested that I buy it, then I can say I got two bags that were 25% off each.

So fits and starts. I have a ton of things I should be doing--grading, first and foremost; laundry, dishes, reading, lesson prep, figuring out dinner--but I'm online instead. And no pictures in this post, since the light is bad--very overcast--and I can't muster up the enthusiasm to take a picture of the-border-that-will-not-end, or of one finished sock.

Monday, September 24, 2007

Finished!

A few details:The collar, because I spent much time looking for and at collar close-ups before knitting this one three times:

And the whole shebang:

Once we're out of the 90 degree forecast, I'll try and take some action shots, if I can get the DH to stand still for long enough.

I spent the weekend in NJ at my parent's house--I went down solo, as DH had too much to do. And besides, that way I could laze around and not feel guilty. :) My aunt's in the hospital, so the main purpose was to go down and visit her. I also got to go to Champions of the Grill at the Sussex County Fair Grounds, right down the street from my folks, and a pig roast. Other weekend highlights included a flea market, where my dad scored 2400 baseball cards for $3--I have fond memories of opening and organizing baseball cards with my dad. It's even more fun with a vodka tonic in hand! I also got to play with the nephew, who was (as always) a charmer, and to hang out with my brother and SIL for a bit.

I got some knitting done, too--a small hat (unphotographed) for a woman my mom knows--done in less than 3 hours--and I've turned the heel and finished the gussets on the SIP (sock-in-progress). No photos of that, either, but since that's still in my possession, there will be some eventually. ETA: The hat was for a baby--a week old--which is why the hat was small. I made an umbilical cord hat from the first Stitch 'n Bitch book.) And knittable in less than 3 hours. (I just re-read this through bloglines and realized that "a small hat" was fairly unclear and lacking in detail.)

All-in-all, a pretty good weekend. I could have done without the 5-hours-each-way drive, though!

Wednesday, September 19, 2007

Almost There! (Stay on Target!)

The husband sweater has been reknit from the first saddle, the back has been grafted, and all that's left is picking up the stitches on the back and knitting the collar! I'm thrilled with the way it's turning out--and, evidently, so the husband, who looked at it this morning and asked if he could wear it today. Given the pointy ends sticking out, I thought it was better he didn't, but I think it bodes well for the future use this sweater will get.

Elizabeth Zimmerman is a genius--this pattern is fantastic. I can't wait to finish the collar and see what it looks like on--I should be done just in time for the 80 degree weather we're expecting this weekend. Perfect wool-sweater weather, naturally.

The Snicket socks are in a time-out; I knit the cuff of the second sock and then realized that the pattern is purl 2, knit one through back leg and not purl 1, knit two through the back legs. So I frogged them completely and cast on for a new sock. Using new yarn.



I'm using the Harlot's basic sock recipe, from Knitting Rules!, in Socks that Rock lightweight (color: Nodding Violet). I cast on 64 stitches on size 1 needles--so far so good! The yarn is nice and squishy--this is my first time using STR, and I'm starting to see what all the fuss is about.

I'm not terribly fond of DPNs, although I am fond of handknit socks. So I've decided that if I'm going to all the trouble of knitting on the, I should only use great yarn (or a great pattern). STR definitely qualifies. Also--their color names? Awesome.

Monday, August 27, 2007

Proof that there has been knitting

Even though there hasn't been any blogging:

Exhibit 1:

One finished Snicket Sock. I ran out of yarn on the toe, so I used some leftover blue. I've started the second one, but I've only got about 10 rows done, so it's not very interesting to look at.













Exhibit 2:


Progress has been made on the Stripes & Torchon lace shawl. The border is a 34 row, 20-30 stitch repeat, filled with double yo's and slip one, knit 2tog, psso's, which is making it hard to memorize. Also making it hard to memorize is the fact that I work a repeat and then put it down for four days, 'cause I'd rather be working on something else. I'm not lovin' the lace at the moment--I want nice, easy knitting. I'm done with 8 border repeats so far. I'm a little afraid to count how many are left!


The change in color is strange, since it's from the same skein of Malabrigo laceweight. There was a knot in the skein, so when I was making balls out of the yarn, I started a new ball when I found the knot. I couldn't believe how different the colors are! But I've decided that such is the way of handknits, and that I'm not going to worry about it.

Exibit 3:

Not actual knitting, but proof of another trip to Webs. Last weekend my DH told me to pick a destination, so I picked Quabbin Reservoir. Which was absolutely gorgeous; I think another trip out when the leaves are turning is in order.

And since we were so close to Northampton, we made a short stop at Webs, where I got some sock yarn in appropriately manly colors for husband socks, yarn for a sweater for him (pictured below), and the 25th Anniversary edition of Vogue Knitting. I don't normally get VK--I like the patterns in IK better--but I bought it for the articles, I swear. :)






Exhibit 4:

Cascade 220 in a loverly heathery green, called lichen, and approved of by DH before purchase. When we started talking about a sweater for him, he said he wanted green--a lichen or moss green. We picked this out, and when I looked it up online later, I realized that even the name was perfect! He liked Webs--they have a nice lounge area with magazines and comfy chairs, suitable for knitting or for waiting for spouses.

I've started an EPS sweater with it--I haven't decided on a style yet, although I'm leaning toward a seamless hybrid. As I've only turned the hem and knit about 4 inches of the body, I've got some time to decide, though.

There is no Exhibit 5, because I'm too lazy to get the camera, but my parents came up for a visit, and bought me a ball winder for my birthday. We went to Fabric Place--my mom wanted to get some Patons Canadiana for a baby blanket, and I had a 25% off total purchase coupon. They also had ball winders (and I had a 40% off a single item coupon, too!)--I've never seen them there before--and so it came home with me. And my birthday's not for another month!

I also had a chance to visit with a cousin I rarely see--he grew up in Colorado to my NJ, and lives in the midwest, but was out for a professional conference. So he, DH and I went to Jasper White's Summer Shack for dinner on Monday night (must take out-of-towners for seafood! and we love Summer Shack), and then picked him up for dinner chez nous Thursday with my parents, whom he also rarely sees.

On top of everything else, my summer class ended on August 16, and grades were due on August 23. Right now I'm trying to get a few of my own things done before the fall semester starts after Labor Day, including coming up with course calendars! Fortunately, both classes I'm teaching I've done before, so I'll probably go with readings that I've used in the past, which makes it a little quicker to put together.

Saturday, August 11, 2007

One Sock, Two Sock (Three Sock!)

One Sock:

Sockapalooza socks--Jaywalkers in Cherry Tree Hill Superwash, from the sadly blogless Lisa in Tennessee!














Thanks, Lisa--they're terrific! I've already worn them once--the weather was a little chilly on Thursday, and I was spending some serious time in an overly-airconditioned library, making hand-knit socks an excellent choice.



Two sock:


Snicket Sock in Gjestal Silja Sock Yarn. A lovely limey chartreuse color.


and my first short-row heel. It's a little wonky--moving the stitches to a spare needle seemed pretty awkward--but it's interesting. And now I know how to do it.






Three sock:

the third sock isn't here, it's in Michigan, at my sock pal's blog: Bethtoons, of Life, Knitting, and the Pursuit of Rollercoasters . I'm so glad that they got to her safely (and that they fit! I was worried they would be too . . . something. Long? Short? Narrow? Wide? But evidently Monkeys are not only brilliant at making pooling disappear, they're brilliant for having an excellent fit. :)

Sunday, July 29, 2007

Two finished monkeys . . .

sitting on the bed!Well, on a towel that's on the bed, anyway. :)

Specs: Cookie A's brilliant Monkey Pattern, size 2 needles, Lorna's Laces in "Icehouse."

for my Sockapalooza Pal. They're almost dry--they should be ready to pack up tomorrow!

Thursday, June 14, 2007

Do I set my Monkey free?*

I was visiting the fam and got rolling on my Sockapalooza socks:

The yarn (Lorna's Laces in Icehouse) is knitting up beautifully--no pooling or spiraling to speak of.

Monkey #1: done to the toe. I didn't have my pal's measurements with me, and wanted to double check before I started on the toe, to make sure the foot is the right length.

Monkey #2: cast on and the ribbing is started. I (with the rest of the blogosphere!) really, really, really like this pattern.

But that leads me to my dilemma: my pal has, it seems, also gotten bitten by the Monkey bug, a fact that I didn't learn until I was pretty committed to the pattern. I'm wondering if I shouldn't make a different pair of socks for my pal, and keep the Monkeys for me (which has nothing-what-so-ever to do with the fact that I love love love these socks.)

What would you do? I'm going to finish the socks, but should I
  • A. send them to my pal when I know that she's made a pair of Monkeys already and pat myself on the back for anticipating her tastes so well, or
  • B. keep them for myself (or maybe as a "hurray! one Christmas present done! kind of a thing) and make an entirely new pair for her?
Help!


*I have George Michaels stuck in my head every time I pick these socks up!