Showing posts with label Christmas knitting. Show all posts
Showing posts with label Christmas knitting. Show all posts

Tuesday, September 23, 2008

Christmas knitting

The first Christmas knit, done:

Hemlock Ring Blanket, Eco-Wool (1.25 skeins), size 10 needles. I really like it, and it was a fast knit--about 10 days from cast-on to blocking. I'm thinking about making a few more as Christmas presents for other people, as well.

Not too much knitting around here. My semester started 2 weeks ago--crazy in the beginning, but it's settling down nicely. I really like my classes--I've got a nice bunch of kids. About half of them are international, which has been making for interesting conversations.

I was down in NJ this weekend, visiting family--I gave T his latest pair of socks, which he was willing to take off for bath time, but insisted on sleeping in. He's so much fun to knit for--I love his response to hand-knit socks. (My brother said that it's good he's now got several pairs; initially it was tough to get them off him long enough to wash. You've got to love that in a recipient!) T & I also had a most excellent water fight. There's nothing like a four-year old to cheer you up.

And I needed cheering up, because the reason we were down in NJ was to put G on a plane to Poland, where he'll be for the next three months. doing research. in Poland. 6 time zones ahead. 4084 miles away. I've put up countdown clocks--one until I go there for Thanksgiving, and one until he comes home for Christmas. (The clocks are too big, though--the seconds don't show up. Eventually either figure out how to fix it, or find new ones that actually fit.)

So it will be a long semester, and I will be knitting up a storm, I think. First up is a new hat for G (it's cold in Poland!)--I managed to shrink his We Call Them Pirates hat (I was in fact trying to shrink it just a little bit, since it had stretched, but managed to go a bit overboard) and he wants a new one.

Sunday, December 23, 2007

In which the knitting gods kick my ass

Only a few days ago, I was feeling quite optimistic about the state of my Christmas knitting.

The SIL shawl was done, the ends were woven in, and--with amazing ease, courtesy of my new blocking wires--it was pinned out to dry:

One major present: done and checked off the list. The only thing left was the wrapping.

The socks-that-come-up-to-his-knees socks for the nephew were well underway; the first one is completely done and clocks in at 9.25 inches, total. And we've got a car ride to NJ--a good four hours of knitting time--for finishing. His knees are about 10" about the ground, so they should be plenty long. I'm making the toes blue (he picked the yarn) so that when his feet grow, which they inevitably will, I can cut them out and make the feet a little longer without any hassle.

Second Christmas knitting project: well underway.


The green blob that was to be the Brother sweater was actually starting to look like a sweater. Both sleeves were attached, and I had knit about 5 inches of the decreases along the shoulders when I realized

(cue scary Jaws music indicating that makes you want to yell: don't go in the water!)

Something was wrong.

(music swells ominously)

I recounted the number of stitches on each sleeve. An EPS sweater is decreased 8 stitches every third round--two on each sleeve, and four on the body. I'd be blithely knitting along, counting the stitches on one of the sleeves, to make sure I was staying on track, but never bothering to check the other sleeve.

(music tempo increases)

I had 54 on one side.

And 64 on the other.

A two-inch difference.

(music stops, screaming begins)

I cannot, it seems, count to 82 with any reliability, even though I checked my counts on both sleeves repeatedly.

Christmas knitting project the third, and my brother's major present: disaster. There's no possible way I can rip back the five inches of the chest, remove the problem sleeve, rip it back six inches, finish the increases, reattach it, redo the chest decreases, finish the chest decreases, and knit the shoulder saddles in the 46 or so hours left until my brother opens his present.

Which, at this point, will be an empty box with a funny note in it. And a story that he'll be able to hold over my head for years to come, which may be more precious than a hand-knit sweater.

The knitting gods are definitely kicking my ass this year.

Wednesday, December 12, 2007

Christmas Knitting Countdown

The SIL shawl: Almost done. 95% done. Less than half a border repeat left. So why is it languishing in the basket?

The nephew socks: Not even started. These weren't really planned as Christmas knitting, but it looks like it will be Christmas before he gets them. The yarn is darker red than the photo suggests.
I need to learn how to knit socks toe-up so I can make them as long as possible, which is why they're not started yet.

The Brother Sweater: the body (all 238 stitches of it) is up to the underarms--18 inches. He's tall, and G tells me the husband sweater would be even better with a couple of extra inches of length. I started the hem of the first sleeve last night.
Right now it looks like a big green blob.

The kicker? As I was taking the points off, and putting the end caps on, I pulled one of my size 6 tips out of the collar. Knitpicks is sending me a new set--they do have excellent customer service--but in the meantime? I'm going to try some fishing glue, and see if I can manage to keep going.

There's nothing like a little pressure to make the Christmas Knitting more enjoyable!